The Treehouse Project

A backyard build, documented as it happens.

Complete

Treehouse complete!

Treehouse complete!

Treehouse complete!

Siding painted, railings on, ladder in, bunting hung. Teddy and Ace are officially moved in.

The whole crew

The whole crew

Family and friends up on the deck to celebrate the finished build.

First playdate

First playdate

Hot Wheels track down, camp chairs set up, and a full house of kids inside.

Me and my builders

Me and my builders

Teddy and Ace on the deck with me. It was a good day to build a treehouse.

House

Walls, roof, siding, door, porch, and ladder.

Railings up

Railings up

Porch railings done. Just about ready for the crew.

Cut station

Cut station

Miter saw set up on the lawn to cut the porch railing pieces.

Ladder in

Ladder in

Ladder built and attached, railing posts going up around the porch.

Little helper

Little helper

Drill in hand, ready to help finish the ladder.

Porch posts

Porch posts

Posts bolted to the porch framing for the railings.

Siding on

Siding on

Siding up and painted. It finally looks like a house.

Porch taking shape

Porch taking shape

Porch framing extended toward the trunk, door primed.

Door hung

Door hung

Board-and-batten door hung and the opening flashed.

Window flashing

Window flashing

Window taped in with ZIP flashing tape.

Door and trim

Door and trim

Built the door and trim frame on the driveway.

Roof framed

Roof framed

Fascia on, window in, door opening framed.

Roof decking

Roof decking

ZIP panels on the roof, tucked up under the magnolia branches.

Sheathing crew

Sheathing crew

Taking a quick break in front of the fresh sheathing.

Rafters on

Rafters on

Rafters set and the door opening framed out.

Build day

Build day

Good company on build day.

Sheathing going on

Sheathing going on

ZIP panels going up on the walls.

Walls framed

Walls framed

All four wall frames up and braced, first ZIP panel in place.

Standing tall

Standing tall

Wall frames up, braced and plumb. First time the treehouse has walls.

Walls going up

Walls going up

Wall frames braced in place, seen from the deck.

Raising the walls

Raising the walls

Me, Greg, and Dave lifting the first wall frame into place on the platform.

Deck

Platform framed, decked, and claimed by the crew.

Family on the platform

Family on the platform

Me, Teddy, and Ace on the deck for the first time.

Little builder

Little builder

Ace grabbed the drill and got to work. No hesitation.

Teaching the tools

Teaching the tools

Showing Teddy how to drive screws. He's a natural.

Kids claim the deck

Kids claim the deck

Deck boards barely down and Teddy and Ace are already up here.

Platform framing

Platform framing

Farley and Ace helping to install the platform joists.

On top of it

On top of it

Celebrating up on the new platform. It is real.

First deck boards

First deck boards

First few deck boards screwed down on the platform frame.

Beam frame on piers

Beam frame on piers

Freestanding beam structure leveled and set on the concrete piers.

Footings

Measuring, digging, and pouring the foundation.

Supports and footings

Supports and footings

First support beams bolted to the tree. Concrete pier footings set in the ground.

Concrete in pajamas

Concrete in pajamas

Ace mixing concrete in her pajamas. Committed to the cause.

Strongest on the crew

Strongest on the crew

Ace hauling the concrete tube form. Strongest one on the crew.

Setting post holes

Setting post holes

Ace and me setting the post holes.

Footing holes

Footing holes

Footing holes dug. Three piers to support the platform.

Digging with the crew

Digging with the crew

Teddy and Ace helping dig the footing holes.

Measuring up

Measuring up

Leveling the first beam. String line from the tree to figure out the right height.

Tribeam

The TABs, the Tribeam, and the first climb.

First one up

First one up

Teddy's the first one up on the Tribeam.

Installing the TAB

Installing the TAB

Me, Tristan, and Dave using every ounce of leverage we can manage to get the TAB installed.

Triangle brace

Triangle brace

Triangle brace frame laid out and test-fitted.

Tribeam assembled

Tribeam assembled

After a lot of creative cuts, finally got the Tribeam assembled.

Birthday TABs

Birthday TABs

My birthday present — TABs for the treehouse! What more could I ask for?